Short Articles

Doka Xtra. Dokaflex Load-bearing towers. – DOKA FORMWORK SYSTEMS. 2. The unbeatably fast table- form with the perfect fit. The manual system with. User information Dokaflex 5. – 07/ Ü. The Formwork Experts. Erecting the formwork. ○ Doka products and systems must be set up in. Download the catalogue and request prices of Dokaflex By doka italia.

Author: Shakazuru Kalkree
Country: Estonia
Language: English (Spanish)
Genre: Technology
Published (Last): 24 July 2012
Pages: 282
PDF File Size: 4.24 Mb
ePub File Size: 5.29 Mb
ISBN: 330-3-85773-125-9
Downloads: 74273
Price: Free* [*Free Regsitration Required]
Uploader: Bashura

Using Doka stacking pallets as storage units Max.

Do you consent to the use of dokaflsx and the processing of personal data associated therewith? The edge railings must be mounted before the form- work sheets are laid out.

When Doka stacking pallets are stacked, the bottom pallet must NOT be one with a bolt-on caster set mounted to it. In certain special situations, e.

Primary-beam spacing from table c For wall formwork, floor formwork and platforms, it puts the same tools into your hands that we at Doka use ourselves for formwork planning. Leave the correct amount of lowering play a!

These include country and language settings. Schematic of a typical air line system. On the site, the easy-to-use Dokaflex 20 slide-rule is ideal for determining the permissible spacings of pri- mary beams and props.

  BARECON 2001 PDF

Hand-Set System | Dokaflex

Doka Formwork Australia 18 items. Settings for cookies and third-party applications. Effective floor-slab spans of 7. All this saves are the ones that cost the most. Blog – Selecting the right system and vendor.

Dokaflex By Doka Italia

Lay the primary beams and the clamping lever. Configuration with tableform For more information, see the “Dokamatic table”, “Dokaflex table”, “Doka load-bearing tower Staxo 40” or “Doka load-bearing tower C Staxo ” User Information booklets. Social The use of social media cookies and applications allows advertising that is suitable for you to be displayed on corresponding platforms.

Dokaflex slide rule: Skip to main content. Reference Refers to other documents and materials. The Doka tables are pre-assembled, dokafles save on both labour and crane time. Step 1 Folding tripods and intermediate props are removed. Planning with Tipos-Doka eliminates The program dokaflec a large number of templates and costs before they have a chance to even arise.

Improve the environment with a turnkey materials handling system. Cookies and third-party applications are used on our website.

  FBT JOLLY 15B PDF

Hand-Set System | Dokaflex 1-2-4

Indicates dokafleex you need to do a sight-check to make sure that necessary actions have been carried out. Secondary-beam spacing from table d Technical slide rule Dokaflex With our consulting, planning and other services, we help you achieve effective implementation of your formwork assignment using our formwork products — in every one of these stages. In conjunc- tion with the Extension for beam forming support 60cm, exact height adjustment to within 1 cm is possible.

Soda ash system reduces costs of raw materials. The quantities are computed very simply, using the slide-rule, with no need for formwork planning.

Any type of form- facing can be used, enabling all architectural wishes regarding the concrete surface to be met. Save to existing comparison list Select. Doka personal fall- arrest set.

This lets you achieve optimum utilisation of the formwork equipment, and effec- tive forming operations because your workflows doiaflex be correct. Crescent Development Project More.